After the Storm
As reported in the recent Tau Talk (Issue #2, Vol. 2025) due to storm damage in April 2025, the House and Shed roofs are being replaced. Siding on the North…
As reported in the recent Tau Talk (Issue #2, Vol. 2025) due to storm damage in April 2025, the House and Shed roofs are being replaced. Siding on the North…
Most of the Alumni money received is spent on general upkeep, repairs, remodeling, and specific improvements. For example, in 1992/1993 a major remodeling took place. Alumni and Actives worked together…
2nd floor Bath 2010- complete gut and rebuild. New shower stalls. Moved the toilet and create a private stall. shower room got new flooring with pan a tile, Thanks to…
Parking lot 2017- The parking lot was extended to add 8 more stalls and level the end. The addition of a retaining wall and a fire pit area.
1st floor bedrooms 2018-built back rooms into 2 suites with bathrooms. New first floor bathroom
Basement 2018 - old kitchen remodeled into 3 bathrooms and opened into other rooms
Front Staircase 2022-all common area flooring on the main level were replaced with beautiful LVP flooring. Should last another 30 years.
Front Staircase 2023 - Front staircase was torn out and rebuilt. This grand staircase was rebuilt to its grandeur of years past. Custom steel railings sets it all off and will…